Skip to content
Bend, OR · High Desert Fitting Bay
CG Match Lab Center-of-Gravity Fitting Studio
Build Times

How Long a Build Takes

The CG session and pickup day usually aren't the same day. Here's what determines the gap between them.

What Drives the Timeline

Stock Components vs. Special Order

If the head and shaft combination from your session is already on the shelf, a single-club build is typically ready in two to three business days — loft and lie set, length cut, grip installed, and CG placement rechecked against your card before it leaves the bench. Special-order heads or low-stock shafts add the manufacturer's lead time, quoted at the end of your session.

Full iron sets take longer even with everything in stock, since each head gets bent to spec individually and rechecked against the gapping printout.

Typical Turnaround
Single club, stock parts2–3 days
Full iron set, stock parts5–7 days
Special-order components+ mfr. lead time

Ask Before You Book

Call ahead and we'll give you a realistic timeline based on current stock and bench load.